Tuesday, 29 September 2015

'Choice' - Call Sheet


Executive Producer:
Producer:
Director:
Production Manager:
Production Coordinator:
1st Assistant Director:

TITLE
DATE:


SHUTTLE INFO:
WEATHER:




First Aid kit and fire extinguisher at the craft table.

CALL TIME
00:00
Check grid for individual call times

LUNCH
00:00




LOCATIONS
#
Location
Address
Parking
Contact
1
Smith’s Bagels
123 John St.
New York, New York
Street Parking out front
Mary
C: 555-555-5555
Scene and Description
Cast
Pgs
Loc














TOTAL PAGES:









#
Cast
Role
Call Time
Pick Up Time
MU/WD
Set Call
1.






2.






3.








Extras/Background


Transportation

SET REQUIREMENTS
Props:
Special Effects:
Vehicles:
Wardrobe:
Set Dressing:

Producer
NAME
PHONE NUMBER
Producer
NAME
PHONE NUMBER
Production Manager
NAME
PHONE NUMBER
Production Coordinator
NAME
PHONE NUMBER
1st Assistant Director
NAME
PHONE NUMBER



Advanced Schedule     Day x of x   00-00-00
Scene and Description
Cast
Pages




















Tuesday, 22 September 2015

'Choice' - Cast and Crew

'Choice's' Casting and Crew

Tony Cash is going to be the Director and the Director of Photography for the film. He will in charge of the cinematography of the film. Tony will mainly be focusing on lighting, framing and composition. He will be helping me with the shots and the type of shots that we use. In post production. Tony will be helping me edit the film. If there is anything in the back ground of the shots that needs digitally removing then Tony will do that. He will also be doing some of the sound mixing and adding some of the effects in.

Charlie will be acting as 1st Assistant Director. Although Charlie won't be operating the cameras he will still be helping to frame the shots and checking the lighting. Charlie will be playing the Character of Eric Mathews and he will be acting in all of the scenes so Charlie wont be behind the camera very much. Charlie will be the assistant editor as it is his film idea so he will be able to tell me the way he wants his film to look.

I will be acting as camera operator and equipment manager throughout production. I will be focusing on camera use and will be handling the Camera Jib, Camera Slider and the JVC Camera. I will be the editor of the film. I will be collecting all of the shots that we have edited and I will be editing it together. I will also be doing most of the sound editing and adding most of the effects as well.

Ashley will be playing the part of Eric's Friend and we have done this because Charlie and Ashley look quite similar and that was needed because the character the Ashley will be playing is supposed to be Eric's subconscious mind.

Monday, 21 September 2015

'Choice' - Script


This is the 9th Draft of the script, it took 9 drafts to make the script as good as possible because we had to keep changing the ideas because we discovered things that we could and couldn't do. The pictures below shot the following corrections we had in each draft:

'Choice' - Equiment List and Expenditure


  Equipment list


·      JVC 3CCD
o   This is a camera that we have borrowed from our college and this is a good camera because it has high quality video and audio recording. We will be using it in fully manual mode so we can have the most freedom to do what we want.
·      Camera Stabilizer
o   The camera stabilizer will be used for walking training shots and this means that we can walk with the camera and have smooth footage and the footage not to be too shaky.
·      Camera Dolly
o   This will be used for the tracking shots. It will mean that we can get smooth tracking shots over a smooth floor.
·      4x Tripods
o   These will be will be uses for the camera so we don’t have the hold the cameras by hand. This will mean that we get completely stable shots.
·      2x Rode Boom pole
o   We will be using these in dialogue scenes and this will mean that we get clear audio for the characters when they are having a conversation.
·      2x LED Lights
o   These lights will be used for highlights on the actor’s faces and for the background. This will be 2 parts of the 3-point lighting.
·      2 x 5in1 lighting reflectors/diffusers/flags
o   These will be used to control the lighting that we have. Either inside with the fill light to diffuse it out or the sunlight outside to make sure it isn’t too bright and causes over-exposure on the camera.





'Choice' - Production Schedule


Date
Task
What we going to do?
Equipment
Cast and crew
21/09/15 – 16/10/15
Pre production
This will be the pre production part. We will finish the scripting and storyboarding. We will also do Recce’s, risk assessments, shooting schedule and develop print ideas.
Macs
Charlie Bell, Tony Cash, David Cuff
19/10/15 – 02/11/15
Filming days
This is the time we are going to film. We will have about 2 weeks to get everything filmed multiple times to make sure we have enough footage.
JVC 3CCD 
Camera Stabilizer
Camera Dolly 
4x Tripods 
2x Rode Boom pole 
2x LED Lights  
2 x 5in1 lighting reflectors/diffusers/flags
Charlie Bell, Tony Cash, David Cuff, James Brookes, Kelly Davis, Ashley Edmonds
02/11/15 – 18/12/15
Editing and print product
This will be where David Cuff and Tony Cash will editing ‘Choice’ while Charlie Bell Will be focusing on the print Products
Macs
David Cuff, Tony Cash, Charlie Bell
04/01/16 – 29/01/16
Final Evaluation
This will be where we evaluate the Productions and Do directors commentary for ‘Choice’
Macs
David Cuff, Tony Cash, Charlie Bell